by ridr4lif » Mon Nov 21, 2005 3:29 pm
Pitman arm.
But yea, that sounds just about right if it were to come into my shop, but we are 90 bux an hour. I would say it should be closer to 650ish. Either way, its a pain in the ass job and i would have the shop do it, considering they are basically pulling the whole front end apart.
You might wanna unload that problem (Blazer) to someone else so you dont have to deal with it anymore

Pitman arm.
But yea, that sounds just about right if it were to come into my shop, but we are 90 bux an hour. I would say it should be closer to 650ish. Either way, its a pain in the ass job and i would have the shop do it, considering they are basically pulling the whole front end apart.
You might wanna unload that problem (Blazer) to someone else so you dont have to deal with it anymore :p